Applying Thin-Set Concrete to Sub Floor Metal Screen

Marking Initial Concrete Area

In our previous article in this floor tiling home renovation project, we had installed the metal tile screen onto the 1/2 inch plywood sub floor in preparation for the new large tiles. Today we quickly examine placing the thin-set concrete into the screen as the last step before the contractors can actually install the new floor tiles. Now, one doesn't need a lot of precision for this step. You just need to ensure you mix the right amount of water with the dry mix so the mud as they call … [Read more...]

Preparing The Front Hall Floor for Tiles – Part 2

Inserting Long Screws Into Sub Floor Depression Filled With Double Plywood

In our continuing series about our front hallway and adjoining laundry room floor tiling project, we reviewed the filling of the sub floor gaps by the stairs, laundry room and living room caused by the previously floors use of narrow yet thick marble inserts. Today we continue with the front hall floor's preparation for new tile. The next step to prepare the floor was of course to screw down the double narrow plywood inserts at the living room, stairs and kitchen areas. Now, look … [Read more...]

Preparing The Front Hall Floor for Tiles – Part 1

Sub Floor Gap From Marble Floor Edge

In our last few articles we reviewed the preparation of the laundry room floor for our joint front hall and adjacent laundry room floor tiling project. Today we look at the preparation of the front hall floor, after the original floor tiles have been removed. Look at the picture below. It shows the marble edge of the front hall floor floor at the entrance to the living room on the opposite side from the laundry room. This was taken prior to the front hallway's 23 year old original tiles … [Read more...]

Preparing Laundry Room Floor For Tiles – Part 2

Plywood On Top of Exposed Closet Floor

In the previous article within this floor tiling project series, we say the initial preparation for the laundry room floor. Today we continue the floor preparation tasks. At this point in the floor preparation process, the 1/4 inch plywood is placed loose on the laundry room floor for two purposes. First , the area of the floor vent is marked off to identify where to cut the its opening. Remember, measure twice and cut once. Notice the two pairs of markings for the vent opening on the … [Read more...]

Featuring Recent Posts WordPress Widget development by YD