Baseboard Almost In Place

Underpadding On Top Of Concrete Floor

In this continuing series on the repair of our foundation wall crack, which caused a water leak in our finished basement within the recent past,  last time we wrote about the replacement of the carpet grabber strips using construction adhesive. After waiting 24 hours we are now ready to return the pulled back under-padding and carpet into its place on the poured concrete floor and reinstall the baseboard molding. The first step was easy enough, simply lay the pulled back under-padding … [Read more...]

Preparing To Lay The Carpet

Missing Carpet Gripper Strips

Yesterday we painted the drywall patch and saw that after two coats of primer plus two coast of paint how there was no difference in the paint colour's tone on the wall. And, that's the point, right? Once the drywall is repaired, you want it looking as if there was no drywall repair in the first place. Now, before the carpet can be put back into position, I needed to replace the carpet tacks gripper strips which were removed during the creation of the dry well as part of the Clarke Basement … [Read more...]

Bathroom Floor Tiling Project – Floor Preparation Under the Bathtub

Bathtub With Tile Floor Border Broken

In yesterday's article we began the preparation of the floor within the bathroom we were going to apply floor tile.Once the carpet, under-padding and baseboard molding were removed, Bennett started to work on the flooring by the bathtub. Why? Well, here is a picture of the bathtub just after the carpet was removed. What you should notice are two things. First, the bathtub has a skirt along its length (removed in the above picture; however you can still see the wooden support frame). … [Read more...]

Featuring Recent Posts WordPress Widget development by YD