Daily Home Renovation Tips每日家裝修秘訣

Providing daily home improvement, remodeling and energy conservation ideas提供日常家居改善,重塑和節約能源的想法

Daily Home Renovation Tips header image 2

Exterior Replacement Door - Part 23 - The Waiting Game外部更換的大門-的一部分, 2 3-輪候遊戲

May 15th, 2008 2008年5月15日 · No Comments沒有評論

Yes, it has been a while since we wrote in是的,它一直以來,雖然我們曾在 Part 22部分22 about the trials and tribulations of our replacement door experiences.關於考驗和磨難,我們更換大門的經驗。 We have not forgotten about you.我們沒有忘記你。 It’s just that we have to wait a bit for the next step.這只是我們要稍等一下,為下一個步驟。

If you recall we had numerous issues with the installation of our replacement front door; everything from missed appointments to missing / broken pieces to in adequate installation and so on.如果你還記得我們曾在許多問題上與安裝我們更換的前門;一切從錯過任命失踪/破碎到足夠的安裝等等。

Back in mid-April, after much consternation, we were able to receive the decision that yes another door & frame would be built and installed in place of this replacement door.早在4月中旬,經過多番驚愕,我們能夠接受的決定是另一門與框架,將興建和安裝到位,這更換的大門。

So, now we wait for the new replacement door to be manufactured.所以,我們現在等待新更換的大門製造。

We received a phone call from the Customer Service representative, Amy, at the building supply retailer’s head off to advise us that the scheduled date for the new replacement door & frame to be completed and delivered to the retailer’s store in our town is June 6th.我們收到的電話,從客戶服務代表,艾米,在建設供應零售商的頭向我們提供意見認為,在預定的日期為新更換的大門&內完成,並交付給零售商的存儲在我們的城市是6月6日。

Fascia Buckling Above Door Frame

Once the door is received by the store and inspected, we will be contacted to arrange for an installation date.一旦收到的大門是由存儲和檢查,我們會聯絡,安排安裝日期。 Past experience has indicated that this installation date would be up to 2 to 3 weeks later.過去的經驗表明,這安裝日期將高達2至3週後。

Lower Vertical Fram Cover 1

We have been assured that:我們已保證:

  • all of the necessary parts will be included the first time, including the part that will allow the top of the door frame to secure against the fascia immediately above to eliminate the current buckling of the fascia caused by the current replacement door所有必要的零件將被納入第一時間,包括一部分,這將使上方的門框,以確保對筋膜立即以上,以消除目前的屈曲筋膜所造成的目前的更換大門
  • the plugs to be used on the outside black cladding will be factory painted black (vs by hand)插頭可用於對外部黑色包層將工廠畫黑色(比手)
  • black exterior caulking will be provided the first time黑色表面嵌縫將提供第一時間
  • the proper length metal threshhold (the metal part that is at the bottom of the door frame)  will be included and it will be installed correctly with full support適當長度的金屬閾值(金屬的一部分,這是在底部的門框)將被納入,並會正確安裝與全力支持
  • and so on.等等。

Black Door Cladding With White Plug

So, not much more to tell at this point.因此,沒有太大的更告訴在這一點上。 We’ll be back to this series on our replacement front door when there is more to report.我們將回到這一系列對我們的更換前門時,有更多的報告。 Hopefully it will be about the installation of the replacement for the replacement door.我希望這將是安裝更換,用於更換的大門。

To continue with the next article in this series, simply select this link to繼續與下篇文章在這一系列,只需選擇此鏈接 Part 24部分24 .

Tags: 標籤: Doors and Windows門窗 · Exterior外部 · Tips With Pictures提示與圖片

0 responses so far ↓ 0反應到目前為止↓

  • There are no comments yet...Kick things off by filling out the form below.有沒有評論...踢的東西,小康填寫下面的表格。

Leave a Comment留下意見

* *
To prove you're a person (not a spam script), type the security word shown in the picture. 要證明你是一個人(不是垃圾腳本) ,鍵入安全顯示的字中的圖片。 Click on the picture to hear an audio file of the word. 點擊該圖片聽到的音頻文件的Word 。
單擊以聽取音頻文件的反垃圾郵件字